Built to spec
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Harrowgate Group completes aboveground storage tank removal directly for industrial owners, facility managers, construction managers, and municipalities across Toronto, the GTA, and Ontario, with the equipment, field controls, documentation, and civil restoration kept under one accountable construction team.
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Durable materials and methods chosen for the load, traffic, and environment on site.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Aboveground storage tank removal decommissions and removes a tank, its supports, containment components, and connected fuel equipment without disrupting adjacent plant operations. Harrowgate performs product recovery, cleaning support, disconnection, rigging, controlled dismantling, environmental response, and civil restoration across Toronto and the GTA under the applicable TSSA fuel requirements.
Our aboveground storage tank removal sequence starts with verified site information, controlled work zones, and written acceptance points, then moves through field execution, consultant inspection, records, and restoration. We assign each material, asset, sample area, and load a defined status so crews know what can move, what must remain exposed, and who releases the next step.
We trace and label each line, shut down the connected equipment, transfer usable product, recover residues, and isolate electrical and mechanical feeds. Cleaning and atmosphere control follow the approved procedure. External insulation or cladding is assessed before disturbance. A whole tank is rigged using engineered attachment and balanced lift points.
Sectional removal uses a defined cut sequence, ventilation, fire control, and piece weights within the lifting route. We remove dispensers, pumps, fill and vent components included in scope, then inspect containment, collect environmental samples where required, and repair the slab or enclosure.
Harrowgate coordinates shutdown, product transfer, excavation, lifting, environmental response, civil reinstatement, and records with one field schedule. Our crews control the work area and keep exposed equipment protected from traffic and weather. Owners receive practical daily reporting on recovered product, removed components, disposal documentation, discovered conditions, inspection points, and restored surfaces.
Materials and acceptance criteria for aboveground storage tank removal come from the current Ontario requirements, approved drawings, consultant documents, receiving facilities, and owner standards that apply to the actual site. We check those criteria before procurement or hauling, record field changes, and preserve the evidence required for inspection, environmental review, and future construction.
The current TSSA adopted code for the stored fuel governs decommissioning and removal. CSA B139 series requirements may apply to oil burning equipment and its supply tanks, while other liquid fuel systems follow the Liquid Fuels Handling Code and Ontario adoption documents. The design review addresses tank construction, supports, separation, venting, fill connection, containment, and connected piping. Rigging calculations use actual geometry and condition. Waste product, wash water, sludge, insulation, and metal are characterized separately because they do not share one disposal route.
Ontario fuel equipment is governed by the Technical Standards and Safety Authority framework and the code adopted for the fuel involved. Current requirements can include the Liquid Fuels Handling Code, its Ontario adoption document, or the CSA B139 series for oil burning equipment. Tank construction, supports, venting, fill, overfill protection, leak detection, corrosion protection, clearances, and contractor qualifications are confirmed against the approved design and current adopted edition.
Aboveground Storage Tank Removal fails when field production gets ahead of characterization, isolation, inspection, or documentation. Harrowgate prevents that gap with staged work, clearly marked hold points, segregated materials, daily records, and immediate escalation of changed conditions. The goal is to protect people and operations while avoiding rejected loads, concealed deficiencies, repeat excavation, and schedule loss.
A closed valve is not positive isolation, and a gauge reading zero does not prove a tank is clean. Low points can retain product and connected return lines can refill the vessel. Corrosion may make lifting lugs unreliable. Cutting can distort the shell or release hidden residue.
We blind or physically disconnect lines where specified, verify atmosphere throughout work, use alternate rigging around sound structure, control drainage, and keep spill response capacity at the work face. Section weights and travel paths are checked before the first cut.
We review the next two weeks of work against approvals, sampling, deliveries, shutdowns, and weather. Daily pre work discussions identify the exact limits and status of each area. Photographs and measurements are taken before concealment, and unresolved items stay visible on the field log until the responsible reviewer provides direction or acceptance.
Have drawings for aboveground storage tank removal? Send them over and we will scope it.
We start with product, tank geometry, condition, connections, containment, access, and lift path. We also confirm access, utilities, operating restrictions, consultant responsibilities, notices, and the intended endpoint. Resolving these items before mobilization lets the field team establish controls, receiving routes, hold points, and contingency space instead of making compliance decisions beside an open excavation.
The main drivers are verified isolation, product recovery, cleaning, atmosphere control, and removal sequence. Weather, laboratory turnaround, inspection availability, and working hours can also control production. We build the sequence around the slowest approval or physical constraint and identify parallel tasks that continue without covering work, mixing materials, or compromising a required hold point.
The governing requirements depend on the material, property, equipment, and approval. The work can involve whole tank rigging when access permits, otherwise controlled sectional dismantling. We confirm the current project specific criteria with the engineer, Qualified Person, owner, municipality, or TSSA as applicable. A general industry practice never replaces the written requirement that governs the actual site.
Our field record includes actual condition, alternate rigging, balanced lifts, and verified component weights. Entries are tied to dates and work areas so quantities and events can be reconstructed. We reconcile documents during the job, not only at closeout, which gives the owner and consultant time to correct a missing ticket, unclear location, or inconsistent quantity before demobilization.
We use separate characterization for product, sludge, wash water, insulation, and recyclable metal. Work pauses until the condition is safe, isolated, and assigned a documented response. The supervisor records what changed, where it occurred, who provided direction, and how material or equipment was controlled, preventing an unexpected discovery from contaminating accepted work or disappearing from the record.
Yes, where the design permits it. We plan sampling or concrete assessment where staining, leakage, or environmental concern exists. The operating boundary, shutdown windows, truck route, emergency access, controls, and daily handback condition are agreed before work starts. Production is staged so facility staff and construction crews do not share uncontrolled access to the work zone.
Closeout should include supports, anchors, containment, penetrations, and slab repaired to the project scope. Depending on the project, it can also include photographs, surveys, receiving records, inspection releases, operating logs, test results, redline drawings, and a list of remaining assets. The package supports the owner's consultant and operations team, but professional certifications remain with the appropriately qualified person.
Still have a question about aboveground storage tank removal? Ask our team directly.
Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.
Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.
Licensed, Insured & WSIB-Covered, work managed and documented on every job
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Harrowgate Group provides aboveground storage tank removal, delivered and installed with quote-ready support across Toronto and surrounding Ontario communities.