Quote-Ready Now Engineer & City Coordinated Licensed & Insured
Waste Diversion Planning and Reporting, completed by Harrowgate Group
Commercial & Heavy-Civil Construction

Waste Diversion Planning and Reporting

Harrowgate Group completes waste diversion planning and reporting directly for developers, general contractors, institutional owners, and municipalities across Toronto, the GTA, and Ontario, with the equipment, field controls, documentation, and civil restoration kept under one accountable construction team.

(416) 629-0721
  • Licensed, Insured & WSIB-Covered
  • 20 Years in Business

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721
20 Years in Business
Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Completed on site and built to the drawings Performed & installed on site across Ontario
Why Harrowgate Group

What to expect from waste diversion planning and reporting

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.

Made to last

Durable materials and methods chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How we plan and deliver waste diversion planning and reporting

Waste diversion planning and reporting turns a project's material inventory into source separation methods, receiving routes, measurable targets, and defensible final quantities. Harrowgate prepares and runs field controls across Toronto and the GTA, collecting load and scale evidence for commercial, industrial, institutional, and municipal construction or demolition programs.

  1. 01 Send your inquiry, a few photos or a description of the site.
  2. 02 We come out, assess the site, take measurements, and confirm the scope.
  3. 03 We complete the waste diversion planning and reporting on site, to the load and finish the job needs.
  4. 04 We install it, finish to grade, and clean up, one accountable crew, start to finish.
Waste Diversion Planning and Reporting being built and completed on site by Harrowgate Group
Local Context

A closer look at waste diversion planning and reporting

Scope

Understanding waste diversion planning and reporting

How we complete waste diversion planning and reporting by Harrowgate Group

How we complete waste diversion planning and reporting

Our waste diversion planning and reporting sequence starts with verified site information, controlled work zones, and written acceptance points, then moves through field execution, consultant inspection, records, and restoration. We assign each material, asset, sample area, and load a defined status so crews know what can move, what must remain exposed, and who releases the next step.

We begin with the waste audit or project inventory, then map bin and stockpile locations against crane, excavator, loading, emergency, and public access. Signs and toolbox instructions tell crews what belongs in each stream.

A ticket register captures date, carrier, material, origin, destination, gross, tare, net weight, and rejected or contaminated loads. We review actual quantities against the forecast during the job, adjust container frequency and sorting labour, and investigate anomalies. Final reporting reconciles weights, estimated volumes where scales are unavailable, reuse records, and residual disposal.

Our supervisors treat diversion as production control. Bin placement, equipment access, labels, contamination checks, pickup timing, ticket collection, and quantity reconciliation appear in the site plan and daily log. This keeps recyclable value from disappearing into mixed debris and gives owners a documented chain from the point of generation to the receiving facility.

Materials, specs, and Ontario standards by Harrowgate Group

Materials, specs, and Ontario standards

Materials and acceptance criteria for waste diversion planning and reporting come from the current Ontario requirements, approved drawings, consultant documents, receiving facilities, and owner standards that apply to the actual site. We check those criteria before procurement or hauling, record field changes, and preserve the evidence required for inspection, environmental review, and future construction.

Ontario Regulation 102/94 applies waste audit and waste reduction work plan requirements to designated construction and demolition projects and other listed establishments. Ontario Regulation 103/94 sets source separation duties and identifies material categories. The provincial guidance uses a 2,000 square metre floor area threshold for designated construction and demolition projects. Ontario Regulation 347 governs waste classification and movement. The project plan records the applicable legal requirements, owner reporting method, facility authorizations, conversion factors, and treatment of reused materials so percentages are calculated consistently.

Ontario Regulation 347 defines and controls waste streams and receiving facilities. Designated construction and demolition projects may also fall under Ontario Regulation 102/94 for waste audits and reduction work plans and Ontario Regulation 103/94 for source separation. Excess soil is assessed separately under Ontario Regulation 406/19 and the Rules for Soil Management. We confirm the governing classification before hauling because soil, processed aggregate, recyclable material, and waste do not share one rule.

What goes wrong, and how we prevent it by Harrowgate Group

What goes wrong, and how we prevent it

Waste Diversion Planning and Reporting fails when field production gets ahead of characterization, isolation, inspection, or documentation. Harrowgate prevents that gap with staged work, clearly marked hold points, segregated materials, daily records, and immediate escalation of changed conditions. The goal is to protect people and operations while avoiding rejected loads, concealed deficiencies, repeat excavation, and schedule loss.

Reports become unreliable when tickets are lost, categories change mid project, commingled loads use an assumed recovery rate with no facility statement, or tonnes and cubic metres are mixed without a documented conversion. Ambitious targets also fail if there is no bin space or market outlet. We validate facilities, set a measurement hierarchy, collect documents weekly, retain rejected load notes, and report both diversion and residuals. Forecast changes are explained rather than hidden behind an inflated percentage.

We review the next two weeks of work against approvals, sampling, deliveries, shutdowns, and weather. Daily pre work discussions identify the exact limits and status of each area. Photographs and measurements are taken before concealment, and unresolved items stay visible on the field log until the responsible reviewer provides direction or acceptance.

Have drawings for waste diversion planning and reporting? Send them over and we will scope it.

Call (416) 629-0721
FAQ

Waste Diversion Planning and Reporting FAQ

What information is needed before waste diversion planning and reporting starts?

We start with project inventory, applicable duties, owner target, outlets, site space, and measurement method. We also confirm access, utilities, operating restrictions, consultant responsibilities, notices, and the intended endpoint. Resolving these items before mobilization lets the field team establish controls, receiving routes, hold points, and contingency space instead of making compliance decisions beside an open excavation.

What drives the schedule and scope for waste diversion planning and reporting?

The main drivers are qualifying projects at the provincial floor area threshold and other designated establishments. Weather, laboratory turnaround, inspection availability, and working hours can also control production. We build the sequence around the slowest approval or physical constraint and identify parallel tasks that continue without covering work, mixing materials, or compromising a required hold point.

Which Ontario requirements apply to this work?

The governing requirements depend on the material, property, equipment, and approval. The work can involve date, material, carrier, source, destination, gross, tare, net, and rejection details. We confirm the current project specific criteria with the engineer, Qualified Person, owner, municipality, or TSSA as applicable. A general industry practice never replaces the written requirement that governs the actual site.

How does Harrowgate document waste diversion planning and reporting?

Our field record includes facility supplied recovery evidence for commingled loads rather than an unsupported assumption. Entries are tied to dates and work areas so quantities and events can be reconstructed. We reconcile documents during the job, not only at closeout, which gives the owner and consultant time to correct a missing ticket, unclear location, or inconsistent quantity before demobilization.

How are unexpected site conditions handled?

We use consistent weight or documented conversion, with reuse and residuals shown separately. Work pauses until the condition is safe, isolated, and assigned a documented response. The supervisor records what changed, where it occurred, who provided direction, and how material or equipment was controlled, preventing an unexpected discovery from contaminating accepted work or disappearing from the record.

Can the work proceed while the facility or project remains active?

Yes, where the design permits it. We plan weekly reconciliation and duplicate requests while source and destination remain identifiable. The operating boundary, shutdown windows, truck route, emergency access, controls, and daily handback condition are agreed before work starts. Production is staged so facility staff and construction crews do not share uncontrolled access to the work zone.

What should be included in the final field record?

Closeout should include forecast variance, contamination, market changes, outlets, and corrective field actions. Depending on the project, it can also include photographs, surveys, receiving records, inspection releases, operating logs, test results, redline drawings, and a list of remaining assets. The package supports the owner's consultant and operations team, but professional certifications remain with the appropriately qualified person.

Still have a question about waste diversion planning and reporting? Ask our team directly.

Call (416) 629-0721
Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for waste diversion planning and reporting

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.

(416) 629-0721

Licensed, Insured & WSIB-Covered, work managed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call now (416) 629-0721