Built to spec
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Harrowgate Group completes clean fill supply and disposal directly for developers, general contractors, municipalities, and facility owners across Toronto, the GTA, and Ontario, with the equipment, field controls, documentation, and civil restoration kept under one accountable construction team.
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Durable materials and methods chosen for the load, traffic, and environment on site.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Clean fill supply and disposal matches documented soil or aggregate with an approved construction use or receiving site, then controls delivery, placement, export, and records. Harrowgate sources, hauls, places, compacts, or removes fill across Toronto and the GTA based on environmental acceptance, geotechnical suitability, project specifications, and Ontario excess soil requirements.
Our clean fill supply and disposal sequence starts with verified site information, controlled work zones, and written acceptance points, then moves through field execution, consultant inspection, records, and restoration. We assign each material, asset, sample area, and load a defined status so crews know what can move, what must remain exposed, and who releases the next step.
For imported fill, we review source documents, environmental results where required, gradation or geotechnical data, estimated volume, delivery schedule, and the exact placement area. A control sample or hold pile is used when the project documents require it.
Trucks are checked against the approved source and rejected if material contains debris, odour, staining, excess organics, frozen chunks, or inconsistent soil. We spread in specified lifts, moisture condition, compact, test, and survey final grades. For disposal or export, loads remain segregated and traceable to an approved receiving destination.
Our supervisors treat diversion as production control. Bin placement, equipment access, labels, contamination checks, pickup timing, ticket collection, and quantity reconciliation appear in the site plan and daily log. This keeps recyclable value from disappearing into mixed debris and gives owners a documented chain from the point of generation to the receiving facility.
Materials and acceptance criteria for clean fill supply and disposal come from the current Ontario requirements, approved drawings, consultant documents, receiving facilities, and owner standards that apply to the actual site. We check those criteria before procurement or hauling, record field changes, and preserve the evidence required for inspection, environmental review, and future construction.
Ontario Regulation 406/19 and the Rules for Soil Management govern qualifying soil movements and reuse conditions. Ontario Regulation 153/04 adds controls for soil imported to some RSC properties. Geotechnical requirements can specify OPSS granular types, particle size distribution, plasticity, organic content, moisture range, lift thickness, and percentage of maximum dry density. The civil and geotechnical documents control performance, while environmental criteria control whether the material is acceptable at that location. Both approvals are required before delivery.
Ontario Regulation 347 defines and controls waste streams and receiving facilities. Designated construction and demolition projects may also fall under Ontario Regulation 102/94 for waste audits and reduction work plans and Ontario Regulation 103/94 for source separation. Excess soil is assessed separately under Ontario Regulation 406/19 and the Rules for Soil Management. We confirm the governing classification before hauling because soil, processed aggregate, recyclable material, and waste do not share one rule.
Clean Fill Supply and Disposal fails when field production gets ahead of characterization, isolation, inspection, or documentation. Harrowgate prevents that gap with staged work, clearly marked hold points, segregated materials, daily records, and immediate escalation of changed conditions. The goal is to protect people and operations while avoiding rejected loads, concealed deficiencies, repeat excavation, and schedule loss.
A common failure is accepting environmentally suitable soil that cannot compact, or strong granular material whose source documentation does not satisfy the site's environmental plan. Mixed truck sources, wet loads, frozen material, and last minute source changes make testing unrepresentative. We approve sources before booking, identify each load, inspect continuously, isolate questionable material, and keep placement zones tied to survey. Trucks do not tip until the receiving area and current source status are confirmed.
We review the next two weeks of work against approvals, sampling, deliveries, shutdowns, and weather. Daily pre work discussions identify the exact limits and status of each area. Photographs and measurements are taken before concealment, and unresolved items stay visible on the field log until the responsible reviewer provides direction or acceptance.
Have drawings for clean fill supply and disposal? Send them over and we will scope it.
We start with intended use, environmental acceptance, source history, soil type, gradation, and moisture. We also confirm access, utilities, operating restrictions, consultant responsibilities, notices, and the intended endpoint. Resolving these items before mobilization lets the field team establish controls, receiving routes, hold points, and contingency space instead of making compliance decisions beside an open excavation.
The main drivers are only after the receiving criteria and source documentation are confirmed compatible. Weather, laboratory turnaround, inspection availability, and working hours can also control production. We build the sequence around the slowest approval or physical constraint and identify parallel tasks that continue without covering work, mixing materials, or compromising a required hold point.
The governing requirements depend on the material, property, equipment, and approval. The work can involve specified lift thickness, moisture conditioning, compaction equipment, and density testing. We confirm the current project specific criteria with the engineer, Qualified Person, owner, municipality, or TSSA as applicable. A general industry practice never replaces the written requirement that governs the actual site.
Our field record includes load rejection, quarantine placement, source review, and replacement with approved material. Entries are tied to dates and work areas so quantities and events can be reconstructed. We reconcile documents during the job, not only at closeout, which gives the owner and consultant time to correct a missing ticket, unclear location, or inconsistent quantity before demobilization.
We use source, truck, date, quantity, placement area, tests, tickets, and survey information. Work pauses until the condition is safe, isolated, and assigned a documented response. The supervisor records what changed, where it occurred, who provided direction, and how material or equipment was controlled, preventing an unexpected discovery from contaminating accepted work or disappearing from the record.
Yes, where the design permits it. We plan quality, haul distance, quantity, loading access, testing, moisture, and placement conditions. The operating boundary, shutdown windows, truck route, emergency access, controls, and daily handback condition are agreed before work starts. Production is staged so facility staff and construction crews do not share uncontrolled access to the work zone.
Closeout should include different environmental, organic, texture, grading, and performance requirements. Depending on the project, it can also include photographs, surveys, receiving records, inspection releases, operating logs, test results, redline drawings, and a list of remaining assets. The package supports the owner's consultant and operations team, but professional certifications remain with the appropriately qualified person.
Still have a question about clean fill supply and disposal? Ask our team directly.
Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.
Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.
Licensed, Insured & WSIB-Covered, work managed and documented on every job
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Harrowgate Group provides clean fill supply and disposal, delivered and installed with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.
Three fields. We reply with the next step.
Thanks, we will call you shortly.