Built to spec
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Stormwater Management and Drainage in Vaughan is the grading, structures, and systems that control and convey site runoff to code.
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Durable materials and methods chosen for the load, traffic, and environment on site.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Stormwater method follows watershed area, design storms, permitted release, water-quality target, groundwater, site grade, available storage, outlet condition, maintenance access, and the sequence in which disturbed land becomes impervious.
Surface ponds and swales. Wet or dry ponds, forebays, channels, berms, emergency spillways, and outlets provide visible storage and treatment where land and grading allow.
Underground storage. Chambers, oversized pipe, concrete tanks, and vaults store runoff below parking or landscaped areas with foundation, access, ventilation, and maintenance constraints.
Quality-treatment devices. Oil-grit separators, hydrodynamic units, filters, infiltration systems, and treatment trains require correct elevation, bypass, sediment protection, and commissioning.
Source and flow controls. Roof controls, orifices, weirs, valves, infiltration galleries, bioretention, and controlled outlets manage runoff close to where it is generated.
Step 1, Review drainage areas, hydraulic model, geotechnical and groundwater data, outlets, treatment train, erosion controls, phasing, maintenance, and commissioning.
Step 2, Install temporary drainage and sediment controls, verify outlet elevations, and prepare stable excavation, liners, foundations, and access.
Step 3, Construct pipe, storage, controls, treatment units, embankments, swales, overflow routes, and erosion protection to survey.
Step 4, Keep sediment and construction water from fouling completed systems, then clean, inspect, test, and commission devices and controls.
Step 5, Stabilize contributing areas, verify storage and flow paths, deliver as-builts and maintenance information, and remove temporary controls only after release.
We build from the approved stormwater report and drawings, converting modeled stages and flows into survey hold points for pond bottoms, tank slabs, pipe inverts, weirs, orifices, berm crests, overflow routes, and outlet protection. Earth facilities are stripped, keyed, and built in tested lifts with core or liner details protected. Underground tanks and oversized pipes are founded on stable bedding and placed with joint, backfill, and flotation controls. Infiltration beds remain isolated from sediment-laden construction runoff and heavy traffic until the tributary area is stabilized.
Control maintenance holes, valves, orifices, weirs, filters, oil-grit units, forebays, and outlet structures are installed to measurable dimensions. Harrowgate checks the actual opening rather than relying on a component label. Swales and channels are graded continuously to secure outlets, with check structures and erosion protection placed before diversion.
The facility is cleaned, sediment depth is verified, vegetation or media is established as required, and access routes are finished for maintenance. Commissioning records confirm control elevations, storage geometry, inspection status, and any testing required by the approval.
Have drawings for stormwater management and drainage in Vaughan? Send them over and we will scope it.
A complete system addresses runoff volume, peak flow, water quality, erosion, water balance, safe surface conveyance, and downstream capacity according to the approved design. Harrowgate builds the physical collection, storage, treatment, infiltration, control, and outlet components, then verifies the elevations and dimensions on which the hydraulic model depends.
Ontario's stormwater framework defines performance levels based on long-term suspended-solids removal and facility design. Current Ontario Regulation 137/25 requires at least enhanced protection for qualifying new works. The engineer identifies the approved treatment train and criteria; Harrowgate protects media, forebays, controls, and storage geometry needed to achieve that design.
Fine sediment from exposed earth can clog native soil, stone voids, geotextile, or engineered media before the facility begins operating. Harrowgate diverts dirty construction runoff, limits trafficking and compaction, keeps stone clean, and delays final connection until tributary surfaces are stabilized. Contaminated material is removed rather than hidden under a clean top layer.
Surveyed bottom, side slope, bench, berm, structure, and overflow elevations are compared with the approved stage-storage geometry. Harrowgate tracks fill and sediment so the constructed basin does not lose volume. Critical measurements occur before topsoil, liner protection, riprap, or water makes the earth surface difficult to inspect and correct.
High velocity, concentrated flow, poor alignment, undersized protection, missing filter, unstable receiving soil, or a tailwater condition different from design can mobilize the outlet. Harrowgate prepares the subgrade, installs specified geotextile, stone, apron, headwall, or energy dissipator, keys edges, and connects the discharge smoothly to the receiving channel.
The opening diameter, shape, invert, plate orientation, seal, fasteners, and upstream debris protection are physically measured against the detail. Harrowgate records the installed control before the chamber is closed. A small dimensional or elevation error can materially alter release rate and storage depth, so the supplier label alone is not accepted as verification.
Provide the approved stormwater report and model criteria, grading and sewer plans, structure details, Environmental Compliance Approval or registration conditions, erosion-control plan, geotechnical and hydrogeological data, liner and media specifications, outlet permits, planting requirements, survey criteria, commissioning tests, maintenance access, and phased temporary-drainage plan.
Quantity controls limit peak flow or store volume. Quality controls remove sediment, oil, nutrients, or other pollutants. Many sites use a treatment train that addresses both before discharge.
Construction sediment can fill storage, blind filters, clog orifices, and overwhelm separators before the permanent site stabilizes. Temporary controls and final cleaning preserve design capacity.
Still have a question about stormwater management and drainage in Vaughan? Ask our team directly.
Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.
Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.
Licensed, Insured & WSIB-Covered, work managed and documented on every job
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Harrowgate Group provides stormwater management and drainage, delivered and installed with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.
Three fields. We reply with the next step.
Thanks, we will call you shortly.