Erosion and Sediment Control, completed by Harrowgate Group
Commercial & Heavy-Civil Construction

Erosion and Sediment Control

Harrowgate performs construction entrances, silt fence, inlet protection, check dams, diversion berms, sediment basins, stabilization, inspection, maintenance, and final removal for Ontario commercial and civil sites.

(416) 629-0721
  • Licensed, Insured & WSIB-Covered
  • 20 Years in Business

Get a Quote

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721

Get a Quote

Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721
20 Years in Business
Licensed, Insured & WSIB-Covered Completed to code & Ontario requirements Completed on site and built to the drawings Performed & installed on site across Ontario
Why Harrowgate Group

What to expect from erosion and sediment control

Built to spec

Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.

Made to last

Durable materials and methods chosen for the load, traffic, and environment on site.

Quote-ready

Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.

Code-conscious

Installation and site work completed in accordance with Ontario requirements.

Our Process

How the erosion and sediment control process works

  1. 1. Initial contact and request for quote. The first erosion and sediment control conversation covers the property, deadline, access, and records needed to determine how to map drainage areas before disturbance.
  2. 2. Drawings, site review, and scope confirmation. Harrowgate reviews the erosion and sediment control documents and site to verify limits, elevations, existing work, and where Construction dewatering affects the need to install perimeter and inlet controls first.
  3. 3. Detailed quote and clear assumptions. Harrowgate's written erosion and sediment control scope covers limits, sequence, access, restoration, and assumptions affecting the ability to inspect around rainfall and snowmelt.
  4. 4. Engineering, consultant, and municipal coordination. Harrowgate carries erosion and sediment control questions to engineers, the architect, consultants, utilities, and the municipality, aligning drawings, permits, inspections, and decisions.
  5. 5. Mobilization and site execution. On-site erosion and sediment control starts after limits, routes, protection, and releases are confirmed, allowing Harrowgate to remove sediment before capacity is lost while coordinating Site grading and earthworks.
  6. 6. Inspection, testing, and documentation. Harrowgate verifies erosion and sediment control at hold points through survey, material records, consultant reviews, inspections, tests, and photographs needed to revise controls as grading redirects flow.
  7. 7. Closeout and handover. The erosion and sediment control handover confirms completed limits, final condition, and records documenting the steps to stabilize surfaces before temporary removal. See the Ontario service-area hub for future erosion and sediment control work.
Erosion and Sediment Control being built and completed on site by Harrowgate Group
Why Us

Why choose Harrowgate for erosion and sediment control

Harrowgate's 20 years in business has shown that successful erosion and sediment control depends on decisions made before production starts. The project is organized around the need to map drainage areas before disturbance, the right time to install perimeter and inlet controls first, and a clear record of any field change.

One accountable team assigned to erosion and sediment control works directly with the project's structural and civil engineers, architect, consultants, utilities, and municipality. Harrowgate tracks the information required to revise controls as grading redirects flow, including interfaces with Stormwater management and drainage and Site restoration and landscaping.

For erosion and sediment control, the written scope also explains the controls and assumptions required to inspect around rainfall and snowmelt.

Harrowgate Group and every trade partner on the project is fully licensed, insured, and WSIB-covered.

Clear scope language, documented hold points, and direct reporting keep erosion and sediment control decisions visible to the client. If the project needs to stabilize surfaces before temporary removal, call (416) 629-0721 or send Harrowgate the drawings and site information.

Erosion and Sediment Control
Local Context

A closer look at erosion and sediment control

Scope

Understanding erosion and sediment control

Which method fits erosion and sediment control? by Harrowgate Group

Which method fits erosion and sediment control?

Method selection for erosion and sediment control follows ground, water, utilities, access, environmental controls, temporary works, material behaviour, receiving capacity, testing, and its required handoff.

Perimeter sediment controls. Silt fence, compost socks, berms, cut-off swales, and stabilized boundaries intercept sheet flow only when keyed, supported, and maintained for the actual drainage area.

Inlet and channel protection. Catch-basin inserts, stone checks, wattles, blankets, turf reinforcement, riprap, and energy dissipation protect concentrated flow without causing unsafe flooding.

Sediment basins and treatment. Traps, ponds, tanks, filtration, flocculation, and settlement systems manage larger flows and fine particles under the environmental design.

Progressive stabilization. Mulch, seed, sod, blankets, stone, pavement, and phased grading reduce exposed soil at the source rather than relying only on downstream barriers.

How we complete erosion and sediment control by Harrowgate Group

How we complete erosion and sediment control

Step 1, map drainage areas, sensitive receivers, outlets, soil, slopes, phasing, inspection triggers, and emergency materials.

Step 2, install perimeter, access, inlet, diversion, basin, and stabilization controls before mass disturbance.

Step 3, inspect during active grading and before, during, and after qualifying weather or snowmelt events.

Step 4, remove accumulated sediment, repair undercut or bypassed controls, and adjust measures as drainage areas change.

Step 5, stabilize final surfaces and remove temporary controls only after the site and receiving system meet release criteria.

We divide clean and dirty water, shorten slope length, slow concentrated flow, protect outlets, and place sediment controls at reachable maintenance locations. The system is staged from clearing through final landscaping so runoff never depends on one silt fence at the property line.

Work stage 1. Before earthwork, we review drainage area, slopes, soil erodibility, receiving inlets, watercourses, stockpiles, access, and the approved ESC plan. Sensitive and no-entry areas are fenced and controls are installed downslope.

Work stage 2. Stabilized construction entrances use sized clear stone over separation fabric at sufficient length and width to remove mud from tires. Street sweeping and wheel cleaning supplement the entrance when tracking continues.

Work stage 3. Silt fence is trenched into the ground, attached to posts on the correct side, turned upslope at ends, and used for sheet flow from limited areas. It is not installed across concentrated channels.

Work stage 4. Catch-basin inserts, filter berms, gravel collars, or sealed temporary covers protect inlets according to the drainage and emergency-overflow plan. Accumulated sediment is removed before it blocks safe site drainage.

Work stage 5. Diversion swales, berms, slope drains, check dams, sediment traps, and basins slow or route runoff through stable paths. Outlets receive rock, matting, or other energy dissipation to prevent a new scour hole.

Work stage 6. Exposed soil is stabilized promptly with mulch, erosion-control blanket, tackifier, aggregate, paving, or permanent vegetation. Inspections after rain, snowmelt, and grading changes trigger repairs, cleanout, upgrades, and plan revisions.

Materials, specs, and Ontario standards

Ontario projects use the approved erosion and sediment control plan, Ontario Regulation 137/25 where applicable to stormwater works, OPSS 805 temporary controls, OPSS 518 dewatering requirements, municipal details, conservation-authority requirements, and the Ontario Water Resources Act prohibition on harmful discharge.

Control point 1. Ontario guidance prioritizes preventing erosion by protecting exposed surfaces and controlling runoff, then adding sediment retention because no active construction site eliminates sediment generation completely.

Control point 2. Provincial guidance limits a typical silt fence to sheet flow from small areas, with slope length behind the barrier no more than about 30 m and slope no steeper than 2 horizontal to 1 vertical in the cited application.

Control point 3. OPSS 805 controls temporary measures such as sediment barriers, inlet protection, check dams, temporary covers, and flow checks on applicable work. The contract drawings define location, type, installation, maintenance, and removal.

Control point 4. Ontario stormwater guidance requires an ESC plan to document preventive measures, keep excessive sediment out of stormwater works and off site, and include removal and reinstatement procedures.

Control point 5. Toronto catch basins connect stormwater to rivers, streams, and Lake Ontario. Soil, slurry, wash water, and other construction material are contained, and private construction water follows sewer permit requirements.

Control point 6. Inspection frequency follows approvals and increases during major earthwork, forecast rain, snowmelt, dewatering, and changes to drainage. Maintenance thresholds are set for sediment accumulation, tears, undercutting, overtopping, and outlet scour.

Have drawings for erosion and sediment control? Send them over and we will scope it.

Call (416) 629-0721
FAQ

Erosion and Sediment Control FAQ

What is the difference between erosion control and sediment control?

Erosion control prevents soil particles from detaching by protecting surfaces and controlling runoff velocity. Sediment control captures particles after they move using barriers, traps, basins, filters, or settling. Harrowgate uses both. A perimeter barrier cannot replace stabilized slopes, and mulch alone cannot capture sediment carried from active excavation or haul routes.

When must erosion and sediment controls be installed?

Controls are installed before clearing, stripping, excavation, or stockpiling creates a sediment path. Perimeter protection, entrances, clean-water diversions, inlet protection, and designated stockpile zones come first. As grading changes, measures move or are added. Temporary controls remain until permanent surfaces, drainage, and vegetation are established and the approved removal criteria are met.

Can silt fence be installed across a drainage ditch?

Silt fence is intended for sheet flow from small areas, not concentrated channel flow. Water concentrated in a ditch can overtop, tear, or undercut it. Harrowgate uses check dams, sediment traps, lined channels, diversion, or other designed measures in ditches, while silt fence is placed along contours with keyed ends and proper trenching.

How often are construction sediment controls inspected?

Inspection frequency follows the approved plan and permits, with additional checks before and after significant rain, snowmelt, dewatering, and major grading changes. Active entrances and inlets are observed daily. Harrowgate records condition, sediment depth, tears, undercutting, overtopping, scour, maintenance, and upgrades so controls remain functional rather than merely present.

How do you protect catch basins without causing site flooding?

The inlet measure is selected for drainage area, sediment load, traffic, and required overflow. Inserts, filter berms, gravel collars, or temporary covers are installed with an approved emergency path. Sediment is removed before capacity is lost. Harrowgate also stabilizes upstream soil so the catch basin is not expected to filter the entire site.

How is muddy dewatering discharge controlled?

Pumped water passes through settling tanks, filter bags, media, sediment basins, or other approved treatment before the permitted outlet. Flow is spread or energy-dissipated so it does not erode the discharge area. Turbidity and required water-quality parameters are monitored, and filters are changed before blinding, rupture, or bypass sends sediment downstream.

When can temporary erosion controls be removed?

Removal occurs after disturbed areas are permanently stabilized, drainage works are operating, vegetation has established to the approval criterion, and accumulated sediment is cleaned out. Controls are removed in a sequence that does not release trapped soil. Harrowgate restores trenches, post holes, stone areas, and flow paths, then documents final condition and any ongoing maintenance items.

Why can silt fence fail during a storm?

Common causes include excessive drainage area, concentrated flow, poor trenching, weak posts, overtopping, undercutting, damage, or accumulated sediment. The right control and maintenance must match the flow.

When can temporary erosion controls be removed?

Removal follows stabilization and project acceptance criteria. Vegetation, stone, pavement, or other permanent cover must be established, drainage must function, and disturbed areas from removal must be restored.

Still have a question about erosion and sediment control? Ask our team directly.

Call (416) 629-0721
Our Work

See real projects across Toronto & Ontario

Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.

View Our Projects

Get a quote for erosion and sediment control

Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.

(416) 629-0721

Licensed, Insured & WSIB-Covered, work managed and documented on every job

Send your project details

Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.

Free, no-obligation quote & on-site assessment · licensed, insured & WSIB-covered.

or
Call (416) 629-0721

Companies We've Worked With

Trusted by Leading Organizations

Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.

Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Popeyes logo Popeyes
Tim Hortons logo Tim Hortons
Subway logo Subway
University of Toronto logo University of Toronto
Madison Group logo Madison Group
RioCan logo RioCan
Women's College Hospital logo Women's College Hospital
Starbucks logo Starbucks
Mazda logo Mazda
TD Bank logo TD Bank
City of Toronto logo City of Toronto
Call now (416) 629-0721