Built to spec
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
A Demolition Contractor performs commercial, industrial, and selective demolition, including concrete and asphalt removal and site clearing, under controlled methods.
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Built to your engineered drawings, survey, and the real site conditions, not a one-size-fits-all approach forced to fit.
Durable materials and methods chosen for the load, traffic, and environment on site.
Send specs, drawings, or photos and get a free, no-obligation site visit and estimate with no guesswork.
Installation and site work completed in accordance with Ontario requirements.
Mechanical demolition uses excavators, processors, shears, breakers, grapples, and loaders for controlled structural removal. Selective dismantling separates retained construction, equipment, and salvage in a planned sequence. Sawcutting, wire sawing, coring, robotic breaking, and hand removal limit vibration or fit constrained interiors.
Crane-assisted and engineered top-down methods address tall, heavy, or inaccessible components. Deconstruction maximizes reuse where time, condition, and markets support it. Implosion is a specialized engineered option, not a default. Structure, neighbours, hazardous materials, utilities, access, vibration, dust, waste goals, and final site condition select the method.
Step 1, Harrowgate demolishes from verified isolation and an approved sequence. Hazardous materials are addressed first, soft strip exposes the structure, temporary support protects retained elements, and mechanical removal proceeds in controlled stages while debris loads, exclusion zones, dust, fire, and adjacent operations remain actively managed.
Step 2, We start with the demolition drawings, structural information, designated-substance survey, utility records, permits, environmental requirements, salvage plan, site logistics, and required end condition. Existing services are located, traced, shut down, disconnected, or protected through documented procedures. Hazardous and designated materials are removed under the applicable plan before demolition reaches them. Harrowgate establishes barriers, exclusion zones, dust and debris controls, traffic routes, fire and emergency provisions, and monitoring.
Soft strip and selective removals expose structural connections and reduce uncontrolled loads. Temporary support is installed before load-bearing elements are cut. Mechanical demolition proceeds in the engineered sequence, generally from high to low, with debris removed so floors and supporting elements are not overloaded. Materials are separated for reuse, recycling, approved disposal, or project-directed handling. Foundations, slabs, tanks, and buried services are removed or left only as the documents direct. Voids are backfilled, compacted, graded, and documented.
Step 3, The demolition plan identifies each retained boundary, structural release point, machine position, drop zone, debris route, floor loading restriction, water source, fire watch, and emergency action. As construction is exposed, the supervisor compares actual framing and connections with the plan. A mismatch stops the affected sequence for engineering review.
Step 4, Harrowgate completes demolition contractor inspection, testing, records, protection, restoration, and turnover under the issued work.
Step 5, Harrowgate completes demolition contractor inspection, testing, records, protection, restoration, and turnover under the issued work.
Have drawings for demolition contractor in North York? Send them over and we will scope it.
Harrowgate checks demolition drawings, structural information, designated-substance survey, permits, utility records and releases, environmental reports, owner requirements, engineering, traffic and logistics plans, fire and emergency procedures, waste destinations, adjacent conditions, and the required final site condition. Missing information is resolved before work reaches the affected area.
Utilities are identified from records and field investigation, traced to their source, and shut down, disconnected, capped, purged, locked out, removed, or protected under the applicable owner and utility procedure. Harrowgate verifies and records the isolation before demolition. Unknown lines uncovered during work are treated as active until identified and controlled.
A designated-substance survey identifies regulated substances that workers could disturb, such as asbestos, lead, silica-containing materials, mercury, and other designated substances relevant to the building. Ontario law requires owners to provide designated-substance information before tendering. Harrowgate uses the survey to plan abatement, controls, sequencing, waste handling, and clearance before demolition.
Harrowgate combines source wetting, local capture, debris handling, covered loads, enclosed routes, cleaning, weather monitoring, and perimeter controls suited to the material and site. Water use is controlled so it does not spread contamination, overload structures, freeze access, or discharge sediment. Monitoring and action levels follow the project plan.
Yes. Harrowgate phases barriers, structural separation, vibration, noise, dust, utilities, fire routes, deliveries, worker access, security, and emergency procedures with operations. Selective work and temporary support preserve retained areas. The operating boundary is inspected daily, and any changed structural or service condition is resolved before demolition advances.
Materials are sorted according to the project plan into salvage, reuse, recycling, clean aggregate processing, regulated waste, and approved disposal streams. Harrowgate records quantities, loads, carriers, and receiving destinations as required. Materials with unknown contamination are isolated and characterized rather than blended into a general debris pile.
The contract defines the end state: retained foundations or complete removal, utility caps, crushed material use, imported backfill, compaction, drainage, grading, fencing, erosion control, or preparation for new construction. Harrowgate surveys hidden remnants, closes voids, tests backfill, removes temporary controls at the approved stage, and documents turnover.
Records and locates establish the planned system, then responsible parties isolate, disconnect, test, and document the actual service at the approved boundary. Shared, concealed, and back-fed systems require particular verification before disturbance.
It describes how structural and non-structural elements will be removed while temporary stability, equipment loads, debris, access, exclusion zones, utilities, and retained construction remain controlled. The sequence changes only through the accepted engineering and project process.
Still have a question about demolition contractor in North York? Ask our team directly.
Commercial and heavy-civil construction delivered for developers, contractors, property managers, and municipalities.
Send drawings, a site plan, or a description of the scope. Harrowgate Group is licensed, insured, and WSIB-covered.
Licensed, Insured & WSIB-Covered, work managed and documented on every job
Tell us what you need and we’ll get you a quote. Licensed, insured & WSIB-covered · Free, no-obligation quote & on-site assessment.
Harrowgate Group provides demolition contractor, delivered and installed with quote-ready support across Toronto and surrounding Ontario communities.
Companies We've Worked With
Harrowgate Group delivers commercial and heavy-civil construction for developers, contractors, institutions, municipalities, and property groups across Ontario.
Three fields. We reply with the next step.
Thanks, we will call you shortly.